Site preparation
Surveying, clearing and leveling the land, access roads, drainage and fencing.

Our crews level the site, set the foundations, assemble the mounting structures, install the panels and connect the plant to the grid. Across North Macedonia, Kosovo and Albania.
From the first machine on site to the day the plant goes live, one team does the work: earthworks and leveling, foundations and piles, mounting structures, panels and electrical.
Solar projects get delayed when the work is split between too many subcontractors. HTE has its own civil, mechanical and electrical crews, so a site goes from bare land to a working plant without handovers.
More than 150 MW of solar plants built, from 200 kW rooftops to a 75 MW solar park.
Earthworks, foundations, structure assembly, panel installation and electrical are done by our people.
We work to EU safety directives and to local permitting and grid connection rules.
A typical plant is assembled in about 80 days, and every phase is planned before work starts.
Every plant on this site was built by HTE crews.

We build ground-mounted and rooftop solar plants for investors, developers, EPC companies and businesses across the Balkans.
To be the contractor that solar projects in North Macedonia and the region can rely on: built fast, built safely and built to last.
Hire us for the complete build or just the part you need: ground-mounted plants, rooftops, battery storage or single work packages.
All services
Full construction of solar parks: site leveling and earthworks, foundations and piles, mounting structures, panel installation and DC/AC electrical works.
Learn more
Solar plants on factory, warehouse and business roofs: roof check, mounting system, panel installation and electrical works.
Learn more
Battery storage added to new or existing solar plants, so the energy you produce is there when you need it.
Learn moreFour stages, one team. Nothing gets lost between subcontractors.
Get a QuoteSurveying, clearing and leveling the land, access roads, drainage and fencing.
Piles or concrete foundations that carry the mounting structure for decades.
Assembling the mounting structures and installing the panels row by row.
DC and AC cabling, inverters, grid connection and testing before handover.
Set your monthly electricity bill and see a rough estimate. No email, no obligation. We give an exact price after visiting the site.
–kWp
Estimate based on average solar irradiation and typical regional prices. The final price depends on the site, equipment and grid connection.
Solar plants built by our crews across North Macedonia, Kosovo and Albania.
Solar plants our crews have built across the region.
Investors, developers and EPC companies.
Engineers, machine operators, installers and electricians.
A selection of the solar plants our crews built in North Macedonia and Kosovo.
All projectsIf your question isn't here, call us and one of our engineers will answer.
We build solar power plants. That includes site preparation and leveling, foundations and piles, mounting structures, panel installation, DC and AC cabling, inverters and grid connection.
We build in North Macedonia, Kosovo and Albania. Our office is in Skopje.
It depends on the size and the site. Our typical plants are assembled in about 80 days. The 20 MW second phase at Novaci took 165 days.
Yes. EPC companies and developers hire us for single packages, for example only leveling and foundations, only structures and panels, or only the electrical works.
Yes. We add battery storage to both new and existing solar plants.
Tier 1 panels such as Longi 555 W, and industrial-grade mounting structures chosen for the terrain and climate.