Ground-mounted solar plants

Full construction of solar parks: site leveling and earthworks, foundations and piles, mounting structures, panel installation and DC/AC electrical works.

Complete constructionHigh Tech Energy
Ground-mounted solar plants

Site preparation and leveling

We start with the ground itself: surveying, clearing, leveling and grading the site, access roads, drainage and fencing, so the structures stand on a stable, even base.

Foundations, structures and panels

Our crews set the piles or concrete foundations, assemble the mounting structures and install the panels row by row, aligned for maximum yield.

Electrical works and grid connection

We lay the DC and AC cabling, install the inverters, connect the plant to the grid and test everything before handover. All work follows EU safety directives and local permitting rules.

Why HTE

  • Earthworks, structures and electrical from one contractor
  • Our own crews, with experience on plants up to 75 MW
  • Full compliance with local and European standards