A construction company built for solar
High Tech Energy builds solar power plants across the Balkans. Our crews take a site from bare land to a working plant: leveling and earthworks, foundations and piles, mounting structures, panel installation and all the electrical work.

Solar construction is what we do
Every job follows strict quality and safety procedures, and every plant is tested before we hand it over.
01One team at every stage
The same team works with you from the first site visit to commissioning.
02European standards, local crews
We work to EU quality and safety standards, with local crews who know the terrain and the permitting process.
03Our goal
To be the contractor that solar projects in North Macedonia and the region can rely on: built fast, built safely and built to last.

What we have built so far
Solar plants built by our crews across North Macedonia, Kosovo and Albania.
Capacity built
Solar plants our crews have built across the region.
Clients
Investors, developers and EPC companies.
Team members
Engineers, machine operators, installers and electricians.
Awards
Recognition for quality and delivery.

Ground-mounted · Rooftop
Our story
For more than 5 years, High Tech Energy has built solar plants for manufacturers, logistics companies, investors and public utilities across the Balkans. In that time our crews have built more than 150 MW, from small rooftops to some of the largest plants in the country.
Planning starts on site
Before we give a price, we look at the terrain, access and grid connection. That way the price and schedule are based on the real site, not on guesses.
- Price and schedule based on the actual site
- A clear scope for every phase of the build
One contractor for the whole build
Solar projects get delayed when the work is split between too many subcontractors. HTE has its own civil, mechanical and electrical crews, so a site goes from bare land to a working plant without handovers.
Experience at scale
More than 150 MW of solar plants built, from 200 kW rooftops to a 75 MW solar park.
Our own crews
Earthworks, foundations, structure assembly, panel installation and electrical are done by our people.
Built to standard
We work to EU safety directives and to local permitting and grid connection rules.
Fast delivery
A typical plant is assembled in about 80 days, and every phase is planned before work starts.